PMEGP Sample DPR Hot in 2026
Ev Charging Station
Samadhan Projects
Reference cost
₹17.3 L
Last reviewed
Pre-2022 (KVIC)
File
PDF · 0.8 MB
BharatSeal · Smart DPR available
Open the Smart DPR — live May 2026 prices, 5-year P&L, scenarios, EMI schedule and bank-ready PDF
Why this is hot in 2026
India had 27,737 public EV chargers by March 2026 against the PM e-Drive target of 72,300 — a 2.6× rollout gap funded by a dedicated ₹2,000 cr corpus. 4,874 fresh chargers were just approved across HPCL/IOCL/BPCL + 8 state govts. Tier-2/3 city sites are still wide open and qualify for capital subsidy. Plan for ~30–35% above KVIC's published cost.
BharatSeal editorial analysis, May 2026. Market figures cited above are sourced from APEDA, KVIC, PIB, IMARC, Mordor Intelligence and similar primary references.
Use as template, not as a quote.Cost line-items in this profile reflect KVIC's publication date (mostly pre-2022). Diesel, electricity, raw-material rates and minimum wages have shifted meaningfully. Your bank will require a refreshed DPR with today's quotes before sanctioning the PMEGP loan.
Use the toolbar inside the preview for zoom, rotate, search, print and download. Open in new tab
PDF authored by KVIC, Ministry of MSME, Government of India. Re-hosted on BharatSeal with attribution; original at kviconline.gov.in.